ENKA Oil and Gas Field Development and Petroleum Related Industries Experience List
ATTACHMENT I
ENKA Oэl and Gas, Fэeld Development and Petroleum Related Industries Commonwealth of Independent States | ||||
Project Name & Location | Client | Comments | Scope of Work | Construction Period |
Sakhalin II Phase 2 Project, Onshore Processing Facility (OPF), Nogliki, Sakhalin Island, Russia | Sakhalin Energy Investment Company Ltd. | OPF will serve as the point for processing of gas and condensate from Lunskoye platform. The gas will be transported by pipeline to the liquefied natural gas plant (LNG), and the condensate will be injected into an oil pipeline which will also pass through the OPF for onward transport to an oil export terminal (OET). At full capacity, the facility will be capable of processing 51 million cubic metres of gas per day. | Engineering, Procurement, Construction | June 2003 to December 2008 |
Sakhalin I Project, Onshore Processing Facility (OPF), Chayvo, Sakhalin Island, Russia | Exxon Neftegas | The OPF process the Chayvo Field production and receive processed crude from the Odoptu Field. During Phase I Oil Production, the Chayvo OPF produce stabilized crude for export to the DeKastri Terminal, dry gas for injection into the Chayvo reservoir, and treated produced water for injection in disposal well(s) at the Chayvo OPF site. | Construction | June 2005 to September 2006 |
Tengiz, Kazakhstan | PFD/Tengizchevroil | SSecond Generation Project (SGP) and Sour Gas Injection (SGI) Projects, Tengiz,- 4 Construction contracts comprising: SGP Crude Stabilization and Gas Processing Multi-Discipline Contract Package SGP Power Generation and On-plot Utilities Multi-Discipline Contract Package SGI Main Mechanical Contract Package SGI Mechanical Installation Contract Package Contracts awarded to Senimdi Kurylys LLP- (Local Kazakhstan company owned by Bechtel - Enka) | Construction contractor for the whole works | Jan 2004-2008 |
Artificial Island Construction Project Caspian Sea /Kazakhstan Unit priced Call off contract | AGIP-KCS | Construction of an artificial island and sub-marine structures in the Caspian Sea. The necessary rock and fill materials for the construction of this island will be supplied via marine way from the quarries located approximately 340 km distance. At this island drilling equipment and other related equipment will be used for the determination of the resources and the extraction of the oil from the Kashagan region. BECHTEL & ENKA JV (50% each) | Procurement and construction contractor for the whole works | March 2001 - March 2004 |
Yukos Research & Development Laboratory Moscow Technology Center Moscow | Yukos Oil | Turn key renovation works of a petrochemical research and development laboratory including all civil, architectural and M&E works in 12,000 m2 of building. | Procurement and construction contractor for the whole works | November 2002 - May 2003 |
Sour Gas Injection Facility Site Preparation and Roads Tengiz/Kazakhstan | Parsons Flour Daniel | Levelling of the project top soil, laying of 50 cm construction mat, construction of roads and fencing. | Procurement, Construction contractor for the whole works | June 2002 - December 2002 |
KTL 2.3 Additions to Tengiz Oil Processing Facilities (Train 5) Tengiz/Kazakhstan | TengizChevroil Limited | All engineering, procurement and civil, structural, electro-mechanical and instrumentation works. BECHTEL & ENKA JV (50% each) | EPC Contractor for the whole works | June 1997 - August 2000 |
Crude Oil Export Project, Tengiz/Kazakhstan | TengizChevroil Limited | Modifications on the storage tanks, Booster pumps, Export pumps, Lines to the Rail Loading rack, Electrical substation. BECHTEL & ENKA JV (50 % each) | EPC Contractor for the whole works | March 2000 - October 2000 |
Refurbishment of the existing Sulphur Recovery Unit 2.1 & 2.2 and LPG Unit 700/200 in KTL 1 and Crude Oil Tankfarm in the Tengiz Oil Processing Facilities (Program 12) Tengiz/Kazakhstan | TengizChevroil Limited | This project consists of 3 sections: Sulphur Recovery Works at KTL 2.1 &KTL 2.2 LPG Unit 700/200 in KTL 1 Crude Oil Tankfarm Construction, piling, erection of steel structure, piping works, insulation, testing and commissionning for the refurbishment of the Tengiz Oil Processing Facilities. BECHTEL & ENKA JV (50 % each) | EPC Contractor for the whole works | June 1999 - December 2000 |
Tengiz Oil Fields Development off Plot Engineering and Construction Contract (OM133) Tengiz/Kazakhstan | TengizChevroil Limited | Design and infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation works and maintenance function for the refurbishment of the plant and camp for 10.000 workers. BECHTEL & ENKA JV (50 % each) | EPC Contractor for the whole works | July 1993 - March 2001 |
Infrastructure Works Engineering & Construction Contract (OM 202) Tengiz/Kazakhstan Call off contract | TengizChevroil Limited | Design and infrastructure of off plot works such as piping, pipelines, civil, electro-mechanical and instrumentation works and maintenance function for the refurbishment of the plant and camp. BECHTEL & ENKA JV (50 % each) | EPC Contractor for the whole works | January 2001 - December 2001 |
Bautino Supply Base Construction Project, Bautino/Kazakhstan | Offshore Kazakhstan International Operation Company - OKIOC | Construction of a Supply Base which will support the planned construction of the sea platforms for the extraction of the oil from the Caspian Sea. The project includes various prefabricated buildings supply and erection together with the turn-key completion of the various infrastructure works. BECHTEL & ENKA JV (50% each) | EPC Contractor for the whole works | May 1998 - September 1998 |
Tengiz Chevroil KTL and off Plot Debottlenecking Contract Tengiz/Kazakhstan | TengizChevroil Limited | All necessary engineering, procurement and civil, electro-mechanical and instrumentation, construction works to increase the existing 6 mio tons/year output capacity of the plant to 8.5 mio t/year. BECHTEL & ENKA JV (50% each) | EPC Contractor for the whole works | November 1996 - November 1998 |
Bautino Stone Supply Contract Bautino/Kazakhstan | Boskalis International B.V. | Operating of 2 rock quarries necessary for the supply of stones to be used in the construction of the offshore islands to be formed for the oil extraction from the Caspian Sea. BECHTEL & ENKA JV (50% each) | Procurement and construction contractor for the whole works | August 1998 - August 1999 |
Bautino Supply Base 99 Project Bautino/Kazakhstan | Offshore Kazakhstan International Operation Company - OKIOC | Engineering, procurement and construc-tion of a sewage treatment plant/ HV overhead line / transformer building and supply and installation of new and relevant synchronisation. BECHTEL & ENKA JV (50% each) | EPC Contractor for the whole works | September 1999 - March 2000 |