Check the power lines (step 2)

Check the power lines (step 2) - student2.ru

1.4Insulation check

The insulation check and resistance measurement list is not included in this FCM. It is documented separately

1.5Remote Serial link: voltage check

Check the power lines (step 2) - student2.ru
RSL Measurement points RSL Voltage
Voltage Reference point
Car Link (P101C) P22M:7 P22M P22M:8 (HL2) 27 - 36 VDC
Hall Link (P1H) Terminal 30 TB2 P22M:8 (HL2) 27 - 36 VDC

1.6Remote Serial link for inspection mode

Reconnect the car link (P101C: COP is not installed) to operate in INS mode

Check the power lines (step 2) - student2.ru

1.7Battery check (E/I-panel)

Check the power lines (step 2) - student2.ru
m Off
l On
Blinking
Check the power lines (step 2) - student2.ru

LED Description Status
BAT-CHARGE Fast charging/ Pre-charge qualification l / ☼
MAINTENANCE Maintenance charging l
FAULT Pre-charge qualification/ Fast charging/ Maintenance charging m
BAT-MODE SPBC_II supplied from controller m
Note: The battery is charged by the SPBC_II. When the power of the system is switched off, the battery will be discharged due to the ongoing power demand from the SPBC_II. When switching off the unit for a longer period of time (> 6h), please disconnect the battery and don't forget to re-connect afterwards!

1.8CAN and SVT communication check (E/I-panel: SPBC_II)

Check the power lines (step 2) - student2.ru

m Off
l On
Blinking

LED Description Status
CAN_OK CAN Bus available
SPB_OK Software proper running, self test passed
Check the power lines (step 2) - student2.ru

1.9TCBC check (E/I- panel: SPBC_II)

·Check the proper inputs (use the LED indications located on SPBC_II)

m Off
l On
Blinking
Check the power lines (step 2) - student2.ru

LED Description Status
GRP/J Error in the line voltage supply m
NOR/DIAG Normal mode m
INS Inspection mode l
ES Emergency Stop m
DW Hoistway doors closed l
DFC Doors fully closed l
DOL Door Open Limit l/m
DOB Door Open Button l/m
Note: If after switching on the main switch, the status of the LED indication differs from the status listed in the table, check the circuits of the corresponding LED's.

2Starting up in inspection

2.1Parameter Setup (E/I- panel)

Check the power lines (step 2) - student2.ru
Control Parameters <3> <5> <2> <GOON>
SpC FNr 1) =
SpC FN0 1) =

1) Necessary to avoid roll back without load weighing

Profile parameters <3> <2> <GO ON>
INS SPE =
     

2.2Encoder Adjustment (E/I- panel: SPBC_II)

Check the power lines (step 2) - student2.ru

2.3Check Run and Encoder Direction (E/I- panel: SPBC_II)

Check the power lines (step 2) - student2.ru

2.4Manual Brake Release check (E/I-panel)

Check the power lines (step 2) - student2.ru

3Prepare first Normal Run

The elevator must be fully completed (wiring and mechanical assembly) before going beyond this point

3.1Connect P1H and check RS power supply

Check the power lines (step 2) - student2.ru
RSL Measurement points RSL Voltage
Voltage Reference point
Car Link (P101C) P22M:7 P22M P22M:8 (HL2) 27 - 36 VDC
Hall Link (P1H) Terminal 30 TB2 P22M:8 (HL2) 27 - 36 VDC

3.2Shunt position to NORMAL

Check the power lines (step 2) - student2.ru

3.3Parameter Setup (E/I- panel)

Check the power lines (step 2) - student2.ru
Control Parameters <3> <5> <2> <GOON>
SpC FNr =
SpC FN0 =
Profile parameters <3> <2> <GO ON>
INS SPE =
     

3.4Software verification (self test): E/I- panel

Check the power lines (step 2) - student2.ru

3.5Check of hoistway signals (E/I- panel)

Check the power lines (step 2) - student2.ru

3.6Start up of DCSS 5

To startup the DCSS5 please refer to the corresponding Field Service Manual

3.7Learn run (E/I- panel)

Check the power lines (step 2) - student2.ru

3.8DCS – Door Check Sequence (E/I-panel: SPBC_II)

Note: In case of failure of a hoistway door contact, the car stops on this floor and is locked. An error message is shown. After elimination of all errors, the car has to be moved to the bottom landing first before starting the DCS RUN once again.
Attention: The new feature Hoistway Access Detection has been implemented to protect persons who entering the hoistway when they are not properly following the safety instructions. Is the DS contact opened for longer then 2 seconds the TCBC will go into ACC mode, the event “0306HWY Access” is logged. The blinking message “Switch INS” appears in the Status menu. The fault will not be cleared by switching the power off and on, the only way to bring the elevator back into normal operation is by ERO or push-and-pull PES.

DCS – Door Check Sequence (continued)

Check the power lines (step 2) - student2.ru

3.9Load Weighing adjust

The mechanical and the electrical installation of the LWB_II with load sensors have to be completely finished (CAN wiring, power supply) as described in the FIM

1.1.1Parameter setup (LWB_II): E/I- panel

Check the power lines (step 2) - student2.ru
No. Function value new calibration necessary?
min. max. default
full load 240kg 3000kg 1000kg if changed
total number of pads (rubber pads+ sensors) if changed
number of sensors if changed
ANS 30kg 250kg 100kg no
LNS 70% 95% 80% no
OLD 100% 110% 110% no

1.1.2Parameter setup (MCB_III): E/I- panel

Check the power lines (step 2) - student2.ru

Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru

Contract parameters <3> <1> <GOON>
LoadW type =
     
Start/stop parameters <3> <4> <GOON>
FULL LOAD [kg] = (e.g. 1600)
BALANCE [%] = (e.g. 47%)
ALWcomp Corr [%] = (e.g. 100): correction factor to avoid rollback

1.1.3Offset calibration

Check the power lines (step 2) - student2.ru

Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru

1.1.4Gain calibration

Check the power lines (step 2) - student2.ru

1.1.5Start behavior check

Check the power lines (step 2) - student2.ru

4Final Adjustment

4.1LV delay (up/down) adjustment

Check the power lines (step 2) - student2.ru
Note: If the magnets are adjusted in the same manner at each floor, the car should stop correctly in each landing, otherwise the magnets should be replaced accordingly. Then a new learn run is necessary.

4.21LS and 2LS delay adjustment

Check the power lines (step 2) - student2.ru

4.3Check of ADO and RLV (Option)

Check the power lines (step 2) - student2.ru

4.4Parameter storage (MCB_III)

Check the power lines (step 2) - student2.ru
Note: Do not choose the Default-values, otherwise the adjusted contract-specific parameters will be lost.

4.5Assignment for building configuration

Note: With the "Allowed Mask", the building configuration (assignment of calls (car / hall), cutting of landings (Cut Call), Card Reader, Parking, Ride profiles) is determined. An assignment is made for every landing. Rear doors are available, if on this landing the elevator may park and with which ride profile the elevator moves to the next landing. The key sequence (M – 1 – 3 – 3) leads to the following "Allowed Menu"

4.6Position Indicator setup

Check the power lines (step 2) - student2.ru
Code Symbol Code Symbol Code Symbol Code Symbol
(blank) J (*) T (*)
A K (*) U
B (*) L V (*)
C M (*) W (*)
D (*) N (*) X (*)
E O Y (*)
F P Z (*)
G (*) Q (*) -
H R (*) *
I (*) S all segments

(*) for 16-segment position indicator and ELD only!

Appendix

System overview

Hoistway installation / motor   Controller   Car   Floor
Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru
Car controller
CAN Bus
RS Link
Drive controller
Check the power lines (step 2) - student2.ru

Figure 1: System overview with used control subsystems

Communication network

Hoistway installation   Controller   Car   Floor
Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru
RS Link Hall
Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru Check the power lines (step 2) - student2.ru

Наши рекомендации